top of page

RESULTS

Results we can show you — and how we measure them.

Every figure on this page carries a label that says what kind of evidence stands behind it. Customers are not named. Details are shared in conversation under NDA.

HOW WE LABEL EVIDENCE

Verified result — measured against a documented baseline and confirmed by the customer

Customer-validated estimate — agreed benefit, not yet fully realized

Identified opportunity — quantified before implementation

Industry benchmark — third-party research, named source

Illustrative — an example, not a customer result

CASE STUDIES

Two engagements, reported at project close.

Both studies are anonymized by industry. Figures are as reported for the engagement described. They are not a forecast for your operation.

INDUSTRIAL MANUFACTURER · SUPPLY CHAIN ENGINEERING

Transportation management, improved without replacing the TMS.

STARTING POINT

A TMS that had never been configured to match how the team worked, sporadic carrier integration, no cost-to-serve visibility and no central store for shipment documents.

WHAT WE DID

Reconfigured the existing TMS, upgraded carrier integrations for automatic status updates and proof of delivery, added Axxis carrier selection and rate optimization, and Bearing for cost-to-serve reporting.

RESULTS · WITHIN 120 DAYS OF IMPLEMENTATION

15%

improvement in on-time delivery

90%

fewer manual shipment status follow-ups

Reported at project close · Methodology available on request

CONSUMER PACKAGED GOODS · SUPPLY CHAIN ENGINEERING

Network optimization and DC relocation.

STARTING POINT

Rising supply chain costs, retailer compliance penalties and operational inefficiency affecting service to major North American retailers.

WHAT WE DID

Modelled the network and relocated a distribution centre, changed transportation and warehouse processes, and redefined inventory strategy: forecasting, replenishment and safety stock.

RESULTS · WITHIN THE FIRST YEAR AFTER IMPLEMENTATION

12%

lower transportation costs

8%

better on-time delivery

7%

lower warehousing costs

17 days

fewer days of inventory on hand

Reported at project close · Methodology available on request

IN PROGRESS

Engagements under way.

Where results have not been measured yet, we show what the engagement covers. Figures are added once they can be labelled.

MINING · MANAGED SERVICES

Integrated execution and freight control for a remote mine site

Vendor collection, load optimization, carrier coverage, freight audit and pay, and decision support in one operating model.

Engagement scope, not a result

INDUSTRIAL MANUFACTURER · ENGINEERING

Outbound flatbed RFP and routing guide

95 asset-based carriers invited, 44 proposals, two bid rounds. Routing guide live August 2026.

Engagement facts · Savings shown once verified

FOOD & BEVERAGE · ENGINEERING

Intelligence and continuous improvement above freight audit

Validated data, KPI dashboards, an opportunity register and monthly engineering support, using Bearing and OnGaard.

Engagement scope, not a result

HOW WE MEASURE RESULTS

What stands behind every number.

For every result we publish, we keep a record of how it was measured. Ask us and we will walk you through it.

01

BASELINE

What was measured before the change, and from which data.

02

PERIOD

When the result was measured, and for how long.

03

METHOD

How the change was calculated, on a like-for-like basis.

04

SOURCE

Whose data it is, and who reviewed it.

05

LABEL

Which of the five evidence types it is.

If a figure cannot be labelled, we do not publish it.

YOUR OPERATION

Every result starts with a baseline.

A Productivity Assessment measures where you are today, with the data you already have, so any improvement can be shown against it.

ChatGPT Image Jun 23, 2026, 01_46_41 PM.png

Let's Build Something Better.

Whether you are looking to improve execution, strengthen governance, increase visibility, or transform your supply chain, we would welcome the opportunity to start the conversation.

bottom of page